
HFO Refinery
We create the possibility to safeguard the national economy and advance the nation's infrastructure.
The Heavy Fuel oil facility is located 45 kilometres south of the city of Erbil in the Kurdistan region. The purpose of the facility is to treat untreated heavy fuel oil and create fuel oil of the requisite grade.
There are seven identical lines constructed at the site for manufacturing a maximum of 3,180 tons of HFO per day, and the factory operates in three shifts 24 hours a day, seven days a week.

Storage Tanks for both Untreated and Treated HFO
Heavy Fuel Oil Treatment Plant (Located inside the Shed), 7 Typical lines.
Instrument Air System
Water Treatment facility
Water bath Heater
PLC system, Workstation
The MCC panels
Diesel Generators
Available equipment for all the 7 lines
Heat Exchangers (Untreated and Treated HFO)-2 nos
Heat Exchangers (Untreated HFO and Hot water)-2 nos
Demulsifier injection system -1 No
Wash water heat exchangers-2 nos
Oily water treatment system (Bilge system with Tank and Pumps).
